How Much #57 Stone for a 16x20 Shed Base?

A 16 by 20 foot shed base is 320 square feet. How much #57 stone for a 16x20 shed base depends on depth: at 4 inches it is about 3.95 cubic yards or 5.3 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.

Volume and tonnage calculator →

The math for a 16x20 shed base

  1. Area: 16 × 20 = 320 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 320 × 0.333 = 106.7 cu ft.
  4. Cubic yards: ÷ 27 = 3.95 yd³.
  5. Tons: × 1.35 = 5.3 tons.

The volume and tonnage calculator does this for any size.

#57 stone needed by depth

DepthCubic yardsTons (approx.)Tons +10%
2 in1.982.72.9
3 in2.964.04.4
4 in3.955.35.9
6 in5.938.08.8

About #57 stone

#57 stone is a clean crushed stone in roughly the 1/2 to 1 inch range with very few fines. It drains fast, which suits drainage layers and the top of a gravel drive, but it does not pack into a hard crust by itself. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the shed base

Level the footprint, extend the stone a foot or so beyond the shed walls for drip and drainage, and compact in lifts. A timber or block border holds the pad shape. This shed base sees a shed floor frame, so match the depth to that load rather than to the minimum.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 5.9 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the shed base as firm ground allows.

Where #57 stone fits

Best suited to:

  • French drains and drainage layers
  • The top course of a gravel driveway
  • Under sheds where water needs to drain away

Think twice for:

  • A standalone base, since it does not pack hard without fines
  • Paver setting beds
  • Walk paths meant for strollers or wheelchairs

Quick reference numbers

  • Per inch over 100 sq ft: about 0.42 tons of #57 stone (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.2 tons.
  • Another size for comparison: a 8x16 area at 4 inches takes about 2.1 tons.
  • Weight used here: about 1.35 tons per cubic yard.

Mistakes that throw off the order

  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
  • Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.

Questions people ask

How many tons of #57 stone for a 16x20 shed base?

About 5.3 tons at 4 inches deep, or 5.9 tons with 10 percent extra.

How many cubic yards is a 16x20 shed base at 4 inches?

About 3.95 cubic yards.

How much does a cubic yard of #57 stone weigh?

Usually around 1.3 to 1.45 tons, depending on stone size, fines and moisture.

How deep should #57 stone be for a shed base?

The table above shows 2 to 6 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 16x20?

320 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.