AsphaltTons.com — asphalt tonnage calculator

How Much Crushed Stone for a 6x8 Shed Base?

How much crushed stone for a 6x8 shed base is a quick volume problem. 48 square feet at 4 inches comes to 0.59 cubic yards. Crushed stone usually weighs about 1.35 to 1.5 tons per cubic yard, so plan on roughly 0.8 tons.

Volume and tonnage calculator →

The math for a 6x8 shed base

  1. Area: 6 × 8 = 48 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 48 × 0.333 = 16.0 cu ft.
  4. Cubic yards: ÷ 27 = 0.59 yd³.
  5. Tons: × 1.4 = 0.8 tons.

The volume and tonnage calculator does this for any size.

Crushed stone needed by depth

DepthCubic yardsTons (approx.)Tons +10%
2 in0.300.40.5
3 in0.440.60.7
4 in0.590.80.9
6 in0.891.21.4

About crushed stone

Most quarries sell crushed stone by a size number or a screen size. Clean crushed stone drains well; stone with fines packs harder but sheds water more slowly. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the shed base

Level the footprint, extend the stone a foot or so beyond the shed walls for drip and drainage, and compact in lifts. A timber or block border holds the pad shape. For a shed floor frame, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 0.9 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At about 0.8 tons this job is small enough that bagged material could work; a 0.5 cubic foot bag holds about 1/54 of a yard, so compare the bag count with a bulk minimum.
  • Where it drops. Have the truck dump as close to the shed base as firm ground allows.

Good and poor uses for crushed stone

Good uses:

  • Driveway top courses and parking pads
  • Shed and hot tub bases
  • Backfill behind walls when a clean size is used

Less suited to:

  • Barefoot areas, since angular stone is rough
  • Play areas
  • Places that need a smooth rolling surface for wheels

Quick reference numbers

  • Per inch over 100 sq ft: about 0.43 tons of crushed stone (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.3 tons.
  • Another size for comparison: a 14x28 area at 3 inches takes about 5.1 tons.
  • Weight used here: about 1.4 tons per cubic yard.

Mistakes that throw off the order

  • Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
  • Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
  • Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.

Questions people ask

How many tons of crushed stone for a 6x8 shed base?

About 0.8 tons at 4 inches deep, or 0.9 tons with 10 percent extra.

How many cubic yards is a 6x8 shed base at 4 inches?

About 0.59 cubic yards.

How much does a cubic yard of crushed stone weigh?

Usually around 1.35 to 1.5 tons, depending on stone size, fines and moisture.

How deep should crushed stone be for a shed base?

The table above shows 2 to 6 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 6x8?

48 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.