AsphaltTons.com — asphalt tonnage calculator

How Much Crusher Run for a 12x20 Parking Pad?

How much crusher run for a 12x20 parking pad is a quick volume problem. 240 square feet at 4 inches comes to 2.96 cubic yards. Crusher run usually weighs about 1.5 to 1.7 compacted tons per cubic yard, so plan on roughly 4.6 tons.

Volume and tonnage calculator →

The math for a 12x20 parking pad

  1. Area: 12 × 20 = 240 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 240 × 0.333 = 80.0 cu ft.
  4. Cubic yards: ÷ 27 = 2.96 yd³.
  5. Tons: × 1.55 = 4.6 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in2.223.43.8
4 in2.964.65.1
6 in4.446.97.6
8 in5.939.210.1

About crusher run

Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the parking pad

Dig out organic soil, compact the subgrade and set an edge so the stone does not migrate onto the lawn. A pad that holds parked weight for long periods benefits from a dense base under the surface stone. For parked vehicles, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 5.1 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the parking pad as firm ground allows.

Where crusher run fits

Best suited to:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Poor fit for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 14x28 area at 2 inches takes about 3.8 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Where estimates go wrong

  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
  • Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
  • Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.

Questions people ask

How many tons of crusher run for a 12x20 parking pad?

About 4.6 tons at 4 inches deep, or 5.1 tons with 10 percent extra.

How many cubic yards is a 12x20 parking pad at 4 inches?

About 2.96 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a parking pad?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 12x20?

240 square feet.