AsphaltTons.com — asphalt tonnage calculator

How Much Crusher Run for a 14x150 Driveway?

A 14 by 150 foot driveway is 2,100 square feet. How much crusher run for a 14x150 driveway depends on depth: at 4 inches it is about 25.93 cubic yards or 40.2 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.

Volume and tonnage calculator →

The math for a 14x150 driveway

  1. Area: 14 × 150 = 2,100 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 2,100 × 0.333 = 700.0 cu ft.
  4. Cubic yards: ÷ 27 = 25.93 yd³.
  5. Tons: × 1.55 = 40.2 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in19.4430.133.2
4 in25.9340.244.2
6 in38.8960.366.3
8 in51.8580.488.4

About crusher run

The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 44.2 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

Where crusher run fits

Good uses:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Poor fit for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 10x20 area at 2 inches takes about 1.9 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Where estimates go wrong

  • Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
  • Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.

Questions people ask

How many tons of crusher run for a 14x150 driveway?

About 40.2 tons at 4 inches deep, or 44.2 tons with 10 percent extra.

How many cubic yards is a 14x150 driveway at 4 inches?

About 25.93 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 14x150?

2,100 square feet.