How Much Crusher Run for a 14x24 Shed Base?
A 14 by 24 foot shed base is 336 square feet. How much crusher run for a 14x24 shed base depends on depth: at 4 inches it is about 4.15 cubic yards or 6.4 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 14x24 shed base
- Area: 14 × 24 = 336 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 336 × 0.333 = 112.0 cu ft.
- Cubic yards: ÷ 27 = 4.15 yd³.
- Tons: × 1.55 = 6.4 tons.
The volume and tonnage calculator does this for any size.
Crusher run needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 3 in | 3.11 | 4.8 | 5.3 |
| 4 in | 4.15 | 6.4 | 7.1 |
| 6 in | 6.22 | 9.6 | 10.6 |
| 8 in | 8.30 | 12.9 | 14.1 |
About crusher run
The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. Weight per yard is a planning number; the scale ticket at the yard is the real one.
Preparing the shed base
Level the footprint, extend the stone a foot or so beyond the shed walls for drip and drainage, and compact in lifts. A timber or block border holds the pad shape. For a shed floor frame, the depths in the table above are a reasonable starting range.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 7.1 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the shed base as firm ground allows.
Good and poor uses for crusher run
Good uses:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Less suited to:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 15x30 area at 3 inches takes about 6.5 tons.
- Weight used here: about 1.55 tons per cubic yard.
Where estimates go wrong
- Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
- Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
Questions people ask
How many tons of crusher run for a 14x24 shed base?
About 6.4 tons at 4 inches deep, or 7.1 tons with 10 percent extra.
How many cubic yards is a 14x24 shed base at 4 inches?
About 4.15 cubic yards.
How much does a cubic yard of crusher run weigh?
Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.
How deep should crusher run be for a shed base?
The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 14x24?
336 square feet.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crusher Run for a 14x16 Shed Base?
- How Much Crusher Run for a 14x20 Shed Base?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.