How Much Crusher Run for a 14x25 Driveway?

How much crusher run for a 14x25 driveway: at 4 inches deep you need about 4.32 cubic yards, which is roughly 6.7 tons at 1.55 tons per yard. The driveway covers 350 square feet, so every inch of depth adds about 1.08 yards.

Volume and tonnage calculator →

The math for a 14x25 driveway

  1. Area: 14 × 25 = 350 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 350 × 0.333 = 116.7 cu ft.
  4. Cubic yards: ÷ 27 = 4.32 yd³.
  5. Tons: × 1.55 = 6.7 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in3.245.05.5
4 in4.326.77.4
6 in6.4810.011.1
8 in8.6413.414.7

About crusher run

Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. Weight per yard is a planning number; the scale ticket at the yard is the real one.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. This driveway sees car and truck traffic, so match the depth to that load rather than to the minimum.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 7.4 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

When to choose crusher run

Good uses:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Think twice for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 15x30 area at 2 inches takes about 4.3 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Mistakes that throw off the order

  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
  • Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
  • Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.

Questions people ask

How many tons of crusher run for a 14x25 driveway?

About 6.7 tons at 4 inches deep, or 7.4 tons with 10 percent extra.

How many cubic yards is a 14x25 driveway at 4 inches?

About 4.32 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 14x25?

350 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.