How Much Crusher Run for a 18x70 Driveway?
How much crusher run for a 18x70 driveway is a quick volume problem. 1,260 square feet at 4 inches comes to 15.56 cubic yards. Crusher run usually weighs about 1.5 to 1.7 compacted tons per cubic yard, so plan on roughly 24.1 tons.
Volume and tonnage calculator →The math for a 18x70 driveway
- Area: 18 × 70 = 1,260 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 1,260 × 0.333 = 420.0 cu ft.
- Cubic yards: ÷ 27 = 15.56 yd³.
- Tons: × 1.55 = 24.1 tons.
The volume and tonnage calculator does this for any size.
Crusher run needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 3 in | 11.67 | 18.1 | 19.9 |
| 4 in | 15.56 | 24.1 | 26.5 |
| 6 in | 23.33 | 36.2 | 39.8 |
| 8 in | 31.11 | 48.2 | 53.0 |
About crusher run
Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. Weight per yard is a planning number; the scale ticket at the yard is the real one.
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 26.5 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
When to choose crusher run
Best suited to:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Poor fit for:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 12x24 area at 2 inches takes about 2.8 tons.
- Weight used here: about 1.55 tons per cubic yard.
Where estimates go wrong
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
- Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
Questions people ask
How many tons of crusher run for a 18x70 driveway?
About 24.1 tons at 4 inches deep, or 26.5 tons with 10 percent extra.
How many cubic yards is a 18x70 driveway at 4 inches?
About 15.56 cubic yards.
How much does a cubic yard of crusher run weigh?
Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.
How deep should crusher run be for a driveway?
The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 18x70?
1,260 square feet.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crusher Run for a 18x50 Driveway?
- How Much Crusher Run for a 18x60 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.
