How Much Crusher Run for a 22x75 Driveway?

How much crusher run for a 22x75 driveway is a quick volume problem. 1,650 square feet at 4 inches comes to 20.37 cubic yards. Crusher run usually weighs about 1.5 to 1.7 compacted tons per cubic yard, so plan on roughly 31.6 tons.

Volume and tonnage calculator →

The math for a 22x75 driveway

  1. Area: 22 × 75 = 1,650 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 1,650 × 0.333 = 550.0 cu ft.
  4. Cubic yards: ÷ 27 = 20.37 yd³.
  5. Tons: × 1.55 = 31.6 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in15.2823.726.0
4 in20.3731.634.7
6 in30.5647.452.1
8 in40.7463.169.5

About crusher run

Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. Ask your supplier for their own tons-per-yard figure, since stone source and moisture shift it.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 34.7 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

When to choose crusher run

Good uses:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Poor fit for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 14x28 area at 2 inches takes about 3.8 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Common estimating mistakes

  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.

Questions people ask

How many tons of crusher run for a 22x75 driveway?

About 31.6 tons at 4 inches deep, or 34.7 tons with 10 percent extra.

How many cubic yards is a 22x75 driveway at 4 inches?

About 20.37 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 22x75?

1,650 square feet.