How much crusher run for a 22x90 driveway: at 4 inches deep you need about 24.44 cubic yards, which is roughly 37.9 tons at 1.55 tons per yard. The driveway covers 1,980 square feet, so every inch of depth adds about 6.11 yards.

Volume and tonnage calculator →

The math for a 22x90 driveway

  1. Area: 22 × 90 = 1,980 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 1,980 × 0.333 = 660.0 cu ft.
  4. Cubic yards: ÷ 27 = 24.44 yd³.
  5. Tons: × 1.55 = 37.9 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in18.3328.431.3
4 in24.4437.941.7
6 in36.6756.862.5
8 in48.8975.883.4

About crusher run

Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 41.7 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

Where crusher run fits

Best suited to:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Poor fit for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 12x24 area at 4 inches takes about 5.5 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Mistakes that throw off the order

  • Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
  • Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.

Questions people ask

How many tons of crusher run for a 22x90 driveway?

About 37.9 tons at 4 inches deep, or 41.7 tons with 10 percent extra.

How many cubic yards is a 22x90 driveway at 4 inches?

About 24.44 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 22x90?

1,980 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.