How Much Crusher Run for a 24x300 Driveway?
A 24 by 300 foot driveway is 7,200 square feet. How much crusher run for a 24x300 driveway depends on depth: at 4 inches it is about 88.89 cubic yards or 137.8 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 24x300 driveway
- Area: 24 × 300 = 7,200 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 7,200 × 0.333 = 2,400.0 cu ft.
- Cubic yards: ÷ 27 = 88.89 yd³.
- Tons: × 1.55 = 137.8 tons.
The volume and tonnage calculator does this for any size.
Related: How Much Gravel for a 24x300 Driveway?
Crusher run needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 3 in | 66.67 | 103.3 | 113.7 |
| 4 in | 88.89 | 137.8 | 151.6 |
| 6 in | 133.33 | 206.7 | 227.3 |
| 8 in | 177.78 | 275.6 | 303.1 |
About crusher run
The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. Ask your supplier for their own tons-per-yard figure, since stone source and moisture shift it.
Related: How Much Crushed Stone for a 12x100 Driveway?
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. This driveway sees car and truck traffic, so match the depth to that load rather than to the minimum.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 151.6 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
Good and poor uses for crusher run
Works well for:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Poor fit for:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 20x25 area at 3 inches takes about 7.2 tons.
- Weight used here: about 1.55 tons per cubic yard.
Mistakes that throw off the order
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
- Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
- Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
Questions people ask
How many tons of crusher run for a 24x300 driveway?
About 137.8 tons at 4 inches deep, or 151.6 tons with 10 percent extra.
How many cubic yards is a 24x300 driveway at 4 inches?
About 88.89 cubic yards.
How much does a cubic yard of crusher run weigh?
Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.
How deep should crusher run be for a driveway?
The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 24x300?
7,200 square feet.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crusher Run for a 24x200 Driveway?
- How Much Crusher Run for a 24x250 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.