How Much Does 13 Tons of Crusher Run Cover?
How much does 13 tons of crusher run cover depends on how deep you spread it. At about 1.55 tons per cubic yard, 13 tons is roughly 8.4 cubic yards. Spread 6 inches deep, that covers about 453 square feet. Every added inch of depth cuts the coverage noticeably.
Volume and tonnage calculator →How the coverage is figured
- Tons to cubic yards: 13 ÷ 1.55 = 8.4 yd³.
- Cubic yards to cubic feet: × 27 = 226 cu ft.
- Divide by depth in feet: at 6 inches (0.500 ft), 226 ÷ 0.500 = 453 sq ft.
Coverage of 13 tons at different depths
| Depth | Square feet covered | Square yards |
|---|---|---|
| 3 in | 906 | 101 |
| 4 in | 679 | 75 |
| 6 in | 453 | 50 |
| 8 in | 340 | 38 |
About crusher run
Crusher run (also sold as crush and run, dense-grade aggregate or QP in some regions) mixes stone with stone dust. It compacts into a firm, nearly solid layer, which makes it the usual base under pavers, asphalt and gravel drives. Weight runs about 1.5 to 1.7 compacted tons per cubic yard, so treat the table as a planning range rather than an exact figure.
Putting 13 tons to use
13 tons is about one tandem-axle truck load, though legal limits vary by truck and state. Spread from the pile with a loader, skid steer or wheelbarrow, then rake to depth before compacting if the material calls for it.
- Check depth as you go. Stakes marked at the target depth help keep the spread even.
- Expect some loss. Compaction and uneven ground use more than the flat-math figure. Keep about 10 percent in reserve.
- Ask about moisture. Wet material weighs more, so a ton of it covers less.
To run your own numbers, use the volume and tonnage calculator.
Good and poor uses for crusher run
Works well for:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Poor fit for:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 14x28 area at 3 inches takes about 5.6 tons.
- Weight used here: about 1.55 tons per cubic yard.
Common estimating mistakes
- Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
- Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
- Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
- Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
Questions people ask
How many cubic yards is 13 tons of crusher run?
About 8.4 cubic yards at 1.55 tons per yard.
How many square feet does 13 tons of crusher run cover at 6 inches?
About 453 square feet.
How many square feet does 13 tons cover at 3 inches?
About 906 square feet.
How much does a yard of crusher run weigh?
About 1.5 to 1.7 compacted tons.
Will 13 tons fit in one truck?
It depends on the truck. Single-axle dump trucks often carry under 10 tons and tandems around 13 to 16; your supplier will know their limits.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does 11 Tons of Crusher Run Cover?
- How Much Does 12 Tons of Crusher Run Cover?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.