Plan a patio, walkway or paver driveway in one pass: how many pavers, how much base gravel and how much bedding sand to order.
A paver job has three materials and this page sizes all three from one area. Pavers are counted per square foot from the paver's face size (a 4 × 8 brick works out to 4.5 per square foot), then rounded up after the waste allowance. Base gravel and bedding sand are volumes: area times depth, divided by 27 for cubic yards, then multiplied by density for tons. Sand uses a dry concrete-sand density of 1.35 tons per yard.
The base is what keeps pavers flat. A patio that only sees foot traffic is usually fine on 4 inches of compacted base, while a driveway needs about twice that. Clay soils or freeze–thaw climates often call for more, so check local practice before you dig.
Patterns with lots of cuts, such as herringbone, or borders with curves use more pavers. Pick 15% waste for those.
How much paver base do I need · How deep paver base should be · Pavers per square foot · Sand for pavers · Paver edge restraint · Permeable pavers · Asphalt vs pavers for a driveway. For sand only, use the sand calculator.
120 square feet of 4 × 8 pavers is 540 pavers, or about 594 with 10% added for cuts and breakage.
For a 120 square foot patio at 4 inches you need about 1.5 cubic yards, roughly 2.2 tons, or about 2.4 tons with 10% extra.
About 4 inches for patios and walks, 6 inches for heavier pads, and around 8 inches for driveways, all compacted.
A 1 inch screeded bed. That is about 0.37 cubic yards, or half a ton, per 120 square feet.
Forty 50 lb bags make a ton. For more than a couple of tons, bulk delivery usually costs less than bags.