AsphaltTons.com — asphalt tonnage calculator

How Far One Ton of Asphalt Goes at 3 Inches Thick

At three inches and 145 pounds per cubic foot, one ton covers about 55 square feet, or about 6.1 square yards. One thousand square feet is about 18.1 tons. Splitting the depth into two lifts does not change the tons if the finish is still three inches.

Open free asphalt tonnage calculator →

A third of the one-inch spread

Three inches is a thickness homeowners repeat for a residential mat, so the per-ton area is worth stating plainly. About 166 square feet per ton at one inch, divided by 3, is about 55 square feet per ton. In square yards that is about 55 divided by 9, or about 6.1. The full check for 1,000 square feet is 1,000 times 3 times 145 divided by 24,000. That is 435,000 divided by 24,000, which is 18.125, or about 18.1 tons. Divide 1,000 by 55 and you are in the same neighborhood, with rounding. Both results are planning estimates at 145 pounds per cubic foot. The plant ticket is the real weight. Write three inches next to 18.1 so the pair is not later reused for a two-inch overlay.

Two lifts, one tonnage

Three inches placed in a single lift can be hard to compact, especially on a cool day or a tight driveway. Many crews place the same finished thickness as two lifts, for example a lower course and a surface course whose depths add to three inches. The tonnage is the same either way if the compacted total is three inches. You can also calculate each lift and add the tons. A two-inch lift on 1,000 square feet is about 12.1 tons, and a one-inch lift is about 6.0 tons. Add them and you get about 18.1 tons, matching the single three-inch calculation. The split changes the mix and the work. It does not change the volume. Tell the plant the total compacted thickness, or give each lift, but do not add the totals twice.

What the residential number still depends on

Three inches of hot mix is only as good as the stone and soil under it. The coverage math does not test the base. It converts area and depth into planning tons. A soft clay lot can need a thicker stone section even when the asphalt stays at three inches. A firmer yard might be discussed differently by the contractor who walks it. Do not read 55 square feet per ton as a code minimum or a code maximum. Hand-placed edges and a flare at the street add area the rectangle missed. If the ticket comes in well above 18.1 tons on a true 1,000 square foot, three-inch job, compare the measured average depth with the plan before you dispute the scale.

A practical sequence

  1. Use about 55 square feet, or 6.1 square yards, per ton at three inches.
  2. For 1,000 square feet, plan on about 18.1 tons before waste.
  3. If you split the mat into lifts, add the lift tons instead of doubling the total.
  4. Call it a planning estimate and let the plant ticket stand as the real weight.

The mistake to skip

Adding the tons for each lift and then adding the full three-inch total again.

Questions people ask

Does placing three inches in two lifts need more tons?

Not if the finished compacted thickness is still three inches. A two-inch lift plus a one-inch lift on the same area uses the same volume as one three-inch mat. On 1,000 square feet that is about 12.1 plus about 6.0, or about 18.1 tons. Extra thickness in the ruts would raise the tons. The plant ticket is the real weight.

How do I convert 55 square feet per ton to a small driveway?

Divide the driveway square footage by about 55. A 600 square foot area is about 10.9 tons, because 600 times 3 times 145 divided by 24,000 is 10.875. That is a planning estimate. Add area for a flare, and confirm the load on the plant ticket.

Related guides