Asphalt Silo: Capacity, Storage Limits and Segregation
An asphalt silo is the tall, insulated steel tank at a hot mix plant that holds finished mix between the drum and the haul trucks. It lets a plant run steadily while trucks arrive in bunches. A silo can also wreck a mix: fill it the wrong way and the stone separates from the fines, and leave mix in too long and the binder stiffens.
Figure how many tons your job needs →What an asphalt silo does
Per the NAPA/AAPTP Asphalt Paving Handbook, most plants have storage silos or a surge bin so they don't shut down every time paving stalls or trucks run short. Fresh mix leaves the drum (or the pugmill on a batch plant) and drops onto an enclosed drag-slat conveyor. The conveyor carries it to the top of the silo. It's held there, then dropped from a bottom gate into a truck on the scale.
Plants use the vessel two ways:
- Surge. A buffer: mix flows in and out all day and nothing sits long. Portable plants often use smaller, uninsulated surge bins that the handbook says can hold mix only for short periods.
- Storage. Insulated, heated silos hold mix for hours or overnight, so a plant can make a long run of one mix and sell it later.
For a small buyer, whether you can get 6 tons of surface mix at 7 a.m. depends on what is already in the silos. It also explains some rules in our asphalt plant minimum order guide. For how the mix is made upstream, see our asphalt plant overview.
Silo parts, from the top down
- Drag-slat conveyor. A chain of steel flights in an enclosed, often heated trough that drags mix up an incline to the silo top. ADEC Engineering's segregation guide says a drag runs best as full as possible. Buildup on cold liners can make it "hydroplane," with mix sliding back over the flights and segregating.
- Batcher. A small hopper on top that collects mix and dumps it in one slug (more below).
- Insulated cylinder. The storage body. Astec's long-term silos use 12 in of insulation on top, 6 in along the cylinder and 4 in around the cone. Its short-term silos use 10 in at the top and bottom seals and 5 in around the sides.
- Cone and heat. The bottom narrows to the discharge gate. Astec builds its long-term cones at 66 degrees, a steep angle it says makes the whole column of mix move down together ("mass flow"), first in and first out, without mix hanging up on the walls. An electric blanket or hot-oil system heats the cone.
- Discharge gate and scale. Clam gates drop mix into the truck. Astec's load-cell silo weighing system is NTEP certified for ticketing.
How big is an asphalt silo?
Astec's 2023 storage brochure lists single silos of 100, 150, 200, 250 and 300 tons, in 12 ft or 14 ft diameters (300 tons only at 14 ft). It says complete systems run from one 100-ton silo up to 3,000-ton multi-silo setups. Its capacities are figured at 120 lb per cubic foot of loose mix.
There's no standard height; it depends on capacity, diameter and truck clearance. For scale, accident reports cited below describe silo conveyor work 67 ft up and a 53 ft fall.
Worked example: tons per foot of silo
Using Astec's 120 lb/ft³ basis and the cylinder only (the cone holds less), as a planning method, not a rating:
| Silo diameter | Cross-section area | Mix per vertical foot | Tons per foot |
|---|---|---|---|
| 12 ft | π × 6² ≈ 113.1 ft² | 113.1 × 120 ≈ 13,572 lb | ≈ 6.8 tons |
| 14 ft | π × 7² ≈ 153.9 ft² | 153.9 × 120 ≈ 18,473 lb | ≈ 9.2 tons |
So when the level indicator on a 12 ft silo drops about 1.3 ft, roughly 9 tons have gone out. That's about one small driveway. A 12 ft × 60 ft driveway paved 2 in thick is 120 ft³ in place. At our usual compacted planning density of 145 lb/ft³, that comes to about 8.7 tons. Our how many tons of asphalt page walks through the same math for any size.
The handbook says to keep a silo one-third to two-thirds full during production. On a 200-ton silo that's about 67 to 133 tons, a 67-ton working swing.
Keeping mix from segregating in the silo
Segregation means coarse stone separating from the sand and binder, leaving coarse patches that ravel early. The Asphalt Paving Handbook warns that a silo can be a major source of segregation if mix goes in the wrong way. Mix should never trickle continuously into the silo; particle size and momentum separate it.
The fix is the batcher. Per the handbook, it sits under the drag with its opening on the silo's centerline. When a preset amount builds up, its gates swing fully open and fully closed so the mix drops as a single mass. ADEC's guide adds practical rules plant operators still use:
- Fill the batcher completely before every drop. ADEC suggests at least 5,000 lb, and the Ontario Asphalt Pavement Council's brochure says at least 2,500 kg.
- Load the batcher in the center. Mix coming down the chute should fall straight down, with no horizontal throw.
- Never let it empty completely. Set the gate time so about 6 in of mix (150–200 mm in the Ontario brochure) stays in the batcher. If the gate stays open too long, new mix falls straight through and the batcher stops doing its job.
- Trigger the dump with high-level indicators (plus a backup), not fill timers, because production rates vary.
How long can mix stay in a silo?
Heat and air oxidize the binder, so the mix gets stiffer the longer it sits. The handbook notes that extended storage can change the mix's volumetric properties and age the binder early, which is why most agencies cap storage time. The rules vary a lot by state:
| Source | Storage limit | Conditions |
|---|---|---|
| Illinois DOT, Std. Spec. 1102.01(a)(5) | 8 hours | Longer only with written approval. Policy memo 5-08 allows up to 20 hours after Illinois Flexibility Index Test evaluation, approved per silo make and model. |
| South Carolina DOT, SC-M-401 | 18 hours, dense-graded | Overnight storage only after the silo passes SC-T-79 testing. Open-graded and SMA mixes are limited to 2 hours. Mix held past 18 hours is discarded. |
| Arkansas DOT, Section 409 | 36 h (¾ in mix) / 18 h (1½ in) in air; 144 h / 72 h under inert gas | Binder must carry an approved silicone additive. Penetration loss in storage can't exceed 20%. Open-graded base can't be stored at all. |
| Astec long-term silo (manufacturer) | Four days | Fully sealed silo. Excludes polymer-modified, open-graded and SMA mixes. |
Illinois also sets a floor: IL-4.75 and SMA mixes with aggregate absorption of 2.5% or more, or with steel slag sand, need at least 1.5 hours of combined silo storage and haul time.
Sealing makes long storage possible. Astec's long-term silos close with a grease-sealed gate on top and an oil-filled, heated gate at the bottom to keep air out. South Carolina's SC-T-79 test checks that a silo is insulated, heated and sealed well enough that stored mix doesn't overheat or take in air.
What this means on the job: if a plant fills its silos at 5 p.m. for a 6 a.m. start, the mix has been stored 13 hours before the first truck. That's past Illinois's default 8 hours but within South Carolina's 18 (if the silo is approved) and Arkansas's 36 for ¾ in mix in air. On a private job no DOT spec applies, but it's fair to ask whether your mix is fresh or came from overnight storage.
Loading trucks from the silo
Even a well-filled silo can segregate the mix at load-out. The handbook says a single drop into the truck sends the big stones rolling to the front and back of the bed. It recommends at least three drops of about equal size: the first at the front of the bed, the second at the tailgate, then the rest in the middle. Longer beds need more drops, usually an odd number, each falling straight down in one mass.
Once the truck pulls off the scale, the clock moves to the haul. Our guide to how long hot mix stays hot in the truck picks up from there. If you want to see the load's temperature yourself, a non-contact gun like the Fluke 62 Max infrared thermometer (rated to 932°F) reads surface temperature only; agency acceptance follows the spec's own test method.
Silo safety: why plants treat them as high-hazard
Silos combine height, heat, moving conveyors and a container you can fall into. Accident records show what goes wrong:
- Falling in. OSHA's accident summary for April 29, 2022 describes a worker who leaned into the top of an asphalt silo to remove a pin on the batcher hatch, fell into the hot mix and died of asphyxiation and burns.
- Unexpected start-up. In November 2021, an 18-year-old was pulled into a hot asphalt silo in Oklahoma City while clearing debris from the conveyor. OSHA found the conveyor had not been locked out and tagged out, and it issued willful citations for missing hazardous-energy procedures and training.
- Fire and explosion. In an August 2008 OSHA case, crews soaked hardened mix on a conveyor with about 25 gallons of diesel, then used propane torches. Burning mix fell into the silo and exploded; the worker who fell 53 ft died.
- Falls from the conveyor. Washington's FACE report describes a supervisor who removed his fall protection in 2017, climbed onto a 50-degree conveyor cover 67 ft up, slid down it and died.
The lessons: lock out the drag, batcher and gates before anyone touches them, treat the silo interior as a permit-required confined space, tie off on every platform and conveyor, and never free hung-up mix with diesel or flame. The binder tanks beside the silos add a gas hazard. Nynas's bitumen guide warns that hydrogen sulfide can build up in tank headspace, including at asphalt plants, and that the gas deadens your sense of smell. The Asphalt Institute cites API guidance to keep heated asphalt tank headspace oxygen between 5% and 8%. Workers near those vents often clip on a single-gas monitor such as the BW Clip H2S detector. Confined-space entry usually calls for a four-gas meter like the BW GasAlertMicroClip XL (O2, LEL, H2S, CO), used under the employer's permit program and the maker's calibration schedule.
Asphalt silo FAQ
How much does an asphalt silo hold?
Astec builds single silos of 100 to 300 tons in 12 ft or 14 ft diameters, and systems up to 3,000 tons. Each foot of a 12 ft cylinder holds about 6.8 tons at 120 lb/ft3.
How long can hot mix be stored in a silo?
It depends on the agency. Illinois allows 8 hours (up to 20 with approval), South Carolina 18 hours for dense-graded mix in an approved silo, and Arkansas 36 hours in air or 144 under inert gas for 3/4 in mix.
Why do asphalt silos have a batcher on top?
Mix trickling into a silo segregates. A batcher collects a full load and drops it in one mass on the centerline, leaving about 6 in behind after each drop.
How should a truck be loaded from a silo?
The Asphalt Paving Handbook recommends at least three equal drops: front of the bed, then tailgate, then middle. A single drop lets coarse stone roll to the ends.
The bottom line
Single silos commonly hold 100 to 300 tons, about 6.8 tons per foot on a 12 ft silo. They protect the mix only when filled through a full, centered batcher, kept one-third to two-thirds full, sealed for long storage and emptied in at least three drops. Storage limits run from 8 hours (Illinois default) to days under inert gas (Arkansas). Lockout, fall protection and confined-space rules keep crews alive.
Sources
- NAPA/AAPTP Asphalt Paving Handbook, 4.8 Temporary Mixture Storage (silos vs surge bins, batcher, one-third to two-thirds level)
- NAPA/AAPTP Asphalt Paving Handbook, 6.4 Proper Truck Loading (minimum three drops, sequence)
- Astec: 2023 Storage Solutions silo brochure (100–300 ton silos, 12/14 ft diameters, 120 lb/ft³ basis, insulation, 66° cone, four-day storage, sealing)
- ADEC Engineering: Segregation, Causes and Cures (drag conveyor hydroplaning, batcher practices)
- Ontario Asphalt Pavement Council: ABCs of Segregation (batcher size and gate settings)
- Illinois DOT Standard Specifications Section 1102, Hot-Mix Asphalt Equipment (surge bins, 8-hour retention, 1.5-hour minimum)
- Illinois DOT Policy Memorandum 5-08, Storage of Hot-Mix Asphalt (20-hour approval)
- South Carolina DOT SC-M-401, Requirements for Mixing Plants (Section 9, Storage of Mixtures)
- South Carolina DOT SC-T-79, Accepting Asphalt Plant Silos for Extended Storage
- Arkansas DOT Standard Specifications Section 409, Storage Silos and Surge Bins
- OSHA accident report: worker fell into hot asphalt silo (April 29, 2022)
- OSHA news release, May 4, 2022: willful citations after worker pulled into hot asphalt silo
- OSHA accident report: silo conveyor fire and explosion (August 12, 2008)
- Washington L&I FACE report: Asphalt Plant Supervisor Dies after Falling down a Drag Slat Conveyor
- Nynas: Safe Handling of Bitumen (hydrogen sulfide in tank headspace)
- Asphalt Institute: Fire safety and pyrophoric material formation (API 5–8% oxygen guidance)