AsphaltTons.com — asphalt tonnage calculator

Why an Asphalt Edge Drop-Off Breaks the Mat

An edge drop-off is a vertical face where the shoulder has eroded. Tires scrub that face and the asphalt breaks back in a scallop. Bring gravel or soil up beside the mat, and cut out asphalt that has lost support. Piling soil on top of the mat does not rebuild the shoulder.

Open free asphalt tonnage calculator →

How the scallop starts

A drop-off is a little cliff at the pavement edge. The shoulder gravel or soil has eroded, and the asphalt sticks out over air or over a rut. A tire that slips off that face scrubs the vertical edge. The asphalt breaks back in a scallop, then the next tire hits the new cliff, and the mat unravels toward the wheel path. You can see it as a wavy, broken rim with a gap beside it. The repair starts beside the mat, not on top of it. Bring gravel or soil back up to support the edge so the face is no longer a step. If the asphalt has already lost support and is cracked in a scallop, cut that broken piece out and patch to full thickness on a rebuilt shoulder.

A shoulder you can estimate

Suppose the missing shoulder is 1 foot wide, 6 inches deep, and 50 feet long. The volume is 1 times 50 times 0.5, which is 25 cubic feet. Divide by 27 and you get about 0.9 cubic yards. A gravel planning default is about 1.4 tons per cubic yard, so 0.9 times 1.4 is about 1.3 tons. That is a planning estimate for the stone you place beside the edge, compacted in thin lifts so it actually supports the mat. The quarry ticket is the real weight. Do not dump that stone in one loose pile and hope rain settles it. If you also patch asphalt, plan the patch near 145 pounds per cubic foot of compacted mix, and let the plant ticket be the real weight of the hot mix. The two tickets are for two materials.

Soil on top of the mat is not a shoulder

Piling soil on top of the asphalt to make a ramp does not replace the missing shoulder beside it. The tire still drops off the buried edge, and the soil holds water on the mat. Place the fill against the side, up to the surface, and keep it off the driving face. Compact it. Where the scallop is already broken, saw a straight face, remove the loose asphalt, and patch so the new edge bears on the rebuilt shoulder. Tack on that patch face, if the quote includes it, is the crew's bond, not a spray job for you. Watch the edge after the next heavy rain. If the shoulder washes again, the drainage along the drive is the real project, and another ton of gravel will follow the same path unless the water is turned.

A practical sequence

  1. Look for a vertical face where the shoulder has eroded beside the asphalt.
  2. Bring gravel or soil up against the side of the mat, not on top of it.
  3. Cut out scalloped asphalt that has lost support and patch on the rebuilt shoulder.
  4. Plan gravel near 1.4 tons per cubic yard and asphalt near 145 pounds per cubic foot, as estimates.

The mistake to skip

Ramping soil across the top of the mat and leaving the unsupported cliff beside it.

Questions people ask

Why does the edge of my driveway keep breaking back?

The shoulder has dropped, so tires scrub a vertical face and the asphalt scallops inward. Bring gravel or soil back up beside the mat to support that face. Cut out pieces that have already lost support and patch them. Soil piled on top of the asphalt does not replace the shoulder. If water keeps washing the side out, fix the drainage or the fill will leave again.

How much gravel fills a drop-off?

A 1 foot by 6 inch shoulder along 50 feet is about 0.9 cubic yards. At a planning default of about 1.4 tons per cubic yard, that is about 1.3 tons. The quarry ticket is the real weight. Compact it in thin lifts beside the edge. Any asphalt patch is separate, planned near 145 pounds per cubic foot, with the plant ticket as the real weight.

Related guides