A 18 by 40 foot parking pad is 720 square feet. How much asphalt millings for a 18x40 parking pad depends on depth: at 4 inches it is about 8.89 cubic yards or 11.6 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.

Volume and tonnage calculator →

The math for a 18x40 parking pad

  1. Area: 18 × 40 = 720 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 720 × 0.333 = 240.0 cu ft.
  4. Cubic yards: ÷ 27 = 8.89 yd³.
  5. Tons: × 1.3 = 11.6 tons.

The volume and tonnage calculator does this for any size.

Asphalt millings needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in6.678.79.5
4 in8.8911.612.7
6 in13.3317.319.1

About asphalt millings

Millings vary by source: some loads are fine and uniform, others carry chunks. Ask the supplier for a screened product if you want a smoother finish, and check local rules, since some areas restrict their use near water. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the parking pad

Dig out organic soil, compact the subgrade and set an edge so the stone does not migrate onto the lawn. A pad that holds parked weight for long periods benefits from a dense base under the surface stone. This parking pad sees parked vehicles, so match the depth to that load rather than to the minimum.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 12.7 tons fits in a single typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the parking pad as firm ground allows.

Where asphalt millings fits

Good uses:

  • Rural driveways and farm lanes
  • Parking areas where a dust-free surface is wanted
  • Low-cost base under a future paved surface

Think twice for:

  • Areas near wells or streams where local rules limit them
  • Decorative or barefoot areas
  • Jobs needing a uniform, clean look

Quick reference numbers

  • Per inch over 100 sq ft: about 0.40 tons of asphalt millings (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.0 tons.
  • Another size for comparison: a 14x28 area at 4 inches takes about 6.3 tons.
  • Weight used here: about 1.3 tons per cubic yard.

Where estimates go wrong

  • Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
  • Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
  • Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.

Questions people ask

How many tons of asphalt millings for a 18x40 parking pad?

About 11.6 tons at 4 inches deep, or 12.7 tons with 10 percent extra.

How many cubic yards is a 18x40 parking pad at 4 inches?

About 8.89 cubic yards.

How much does a cubic yard of asphalt millings weigh?

Usually around 1.2 to 1.4 loose tons, depending on stone size, fines and moisture.

How deep should asphalt millings be for a parking pad?

The table above shows 3 to 6 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 18x40?

720 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.