How Much Crushed Stone for a 24x70 Driveway?
A 24 by 70 foot driveway is 1,680 square feet. How much crushed stone for a 24x70 driveway depends on depth: at 4 inches it is about 20.74 cubic yards or 29.0 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 24x70 driveway
- Area: 24 × 70 = 1,680 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 1,680 × 0.333 = 560.0 cu ft.
- Cubic yards: ÷ 27 = 20.74 yd³.
- Tons: × 1.4 = 29.0 tons.
The volume and tonnage calculator does this for any size.
Crushed stone needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 2 in | 10.37 | 14.5 | 16.0 |
| 3 in | 15.56 | 21.8 | 24.0 |
| 4 in | 20.74 | 29.0 | 31.9 |
| 6 in | 31.11 | 43.6 | 47.9 |
About crushed stone
Crushed stone has fractured faces, so the pieces interlock when compacted. That is why it holds a driveway or pad shape better than round stone of the same size. Weight per yard is a planning number; the scale ticket at the yard is the real one.
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. This driveway sees car and truck traffic, so match the depth to that load rather than to the minimum.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 31.9 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
When to choose crushed stone
Good uses:
- Driveway top courses and parking pads
- Shed and hot tub bases
- Backfill behind walls when a clean size is used
Poor fit for:
- Barefoot areas, since angular stone is rough
- Play areas
- Places that need a smooth rolling surface for wheels
Quick reference numbers
- Per inch over 100 sq ft: about 0.43 tons of crushed stone (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.3 tons.
- Another size for comparison: a 10x20 area at 3 inches takes about 2.6 tons.
- Weight used here: about 1.4 tons per cubic yard.
Mistakes that throw off the order
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
- Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
- Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
Questions people ask
How many tons of crushed stone for a 24x70 driveway?
About 29.0 tons at 4 inches deep, or 31.9 tons with 10 percent extra.
How many cubic yards is a 24x70 driveway at 4 inches?
About 20.74 cubic yards.
How much does a cubic yard of crushed stone weigh?
Usually around 1.35 to 1.5 tons, depending on stone size, fines and moisture.
How deep should crushed stone be for a driveway?
The table above shows 2 to 6 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 24x70?
1,680 square feet.
Related guides
- How Much Does a Ton of Crushed Stone Cover?
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crushed Stone for a 24x50 Driveway?
- How Much Crushed Stone for a 24x60 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.
