How Much Crusher Run for a 24x70 Driveway?
A 24 by 70 foot driveway is 1,680 square feet. How much crusher run for a 24x70 driveway depends on depth: at 4 inches it is about 20.74 cubic yards or 32.1 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 24x70 driveway
- Area: 24 × 70 = 1,680 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 1,680 × 0.333 = 560.0 cu ft.
- Cubic yards: ÷ 27 = 20.74 yd³.
- Tons: × 1.55 = 32.1 tons.
The volume and tonnage calculator does this for any size.
Crusher run needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 3 in | 15.56 | 24.1 | 26.5 |
| 4 in | 20.74 | 32.1 | 35.4 |
| 6 in | 31.11 | 48.2 | 53.0 |
| 8 in | 41.48 | 64.3 | 70.7 |
About crusher run
The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. Since the driveway carries car and truck traffic, a little extra depth is cheap insurance.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 35.4 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
When to choose crusher run
Good uses:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Think twice for:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 14x28 area at 2 inches takes about 3.8 tons.
- Weight used here: about 1.55 tons per cubic yard.
Mistakes that throw off the order
- Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
- Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
Questions people ask
How many tons of crusher run for a 24x70 driveway?
About 32.1 tons at 4 inches deep, or 35.4 tons with 10 percent extra.
How many cubic yards is a 24x70 driveway at 4 inches?
About 20.74 cubic yards.
How much does a cubic yard of crusher run weigh?
Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.
How deep should crusher run be for a driveway?
The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 24x70?
1,680 square feet.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crusher Run for a 24x50 Driveway?
- How Much Crusher Run for a 24x60 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.
