How Much Crushed Stone for a 24x80 Driveway?
A 24 by 80 foot driveway is 1,920 square feet. How much crushed stone for a 24x80 driveway depends on depth: at 4 inches it is about 23.70 cubic yards or 33.2 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 24x80 driveway
- Area: 24 × 80 = 1,920 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 1,920 × 0.333 = 640.0 cu ft.
- Cubic yards: ÷ 27 = 23.70 yd³.
- Tons: × 1.4 = 33.2 tons.
The volume and tonnage calculator does this for any size.
Crushed stone needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 2 in | 11.85 | 16.6 | 18.3 |
| 3 in | 17.78 | 24.9 | 27.4 |
| 4 in | 23.70 | 33.2 | 36.5 |
| 6 in | 35.56 | 49.8 | 54.8 |
About crushed stone
Most quarries sell crushed stone by a size number or a screen size. Clean crushed stone drains well; stone with fines packs harder but sheds water more slowly. Weight per yard is a planning number; the scale ticket at the yard is the real one.
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 36.5 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
When to choose crushed stone
Good uses:
- Driveway top courses and parking pads
- Shed and hot tub bases
- Backfill behind walls when a clean size is used
Think twice for:
- Barefoot areas, since angular stone is rough
- Play areas
- Places that need a smooth rolling surface for wheels
Quick reference numbers
- Per inch over 100 sq ft: about 0.43 tons of crushed stone (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.3 tons.
- Another size for comparison: a 8x16 area at 4 inches takes about 2.2 tons.
- Weight used here: about 1.4 tons per cubic yard.
Where estimates go wrong
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Measuring only the main rectangle. Aprons, turnouts and curved edges add real square footage.
- Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
Questions people ask
How many tons of crushed stone for a 24x80 driveway?
About 33.2 tons at 4 inches deep, or 36.5 tons with 10 percent extra.
How many cubic yards is a 24x80 driveway at 4 inches?
About 23.70 cubic yards.
How much does a cubic yard of crushed stone weigh?
Usually around 1.35 to 1.5 tons, depending on stone size, fines and moisture.
How deep should crushed stone be for a driveway?
The table above shows 2 to 6 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 24x80?
1,920 square feet.
Related guides
- How Much Does a Ton of Crushed Stone Cover?
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crushed Stone for a 24x70 Driveway?
- How Much Crushed Stone for a 24x75 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.
