How Much Crusher Run for a 24x30 Driveway?
A 24 by 30 foot driveway is 720 square feet. How much crusher run for a 24x30 driveway depends on depth: at 4 inches it is about 8.89 cubic yards or 13.8 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.
Volume and tonnage calculator →The math for a 24x30 driveway
- Area: 24 × 30 = 720 sq ft.
- Depth in feet: 4 ÷ 12 = 0.333 ft.
- Cubic feet: 720 × 0.333 = 240.0 cu ft.
- Cubic yards: ÷ 27 = 8.89 yd³.
- Tons: × 1.55 = 13.8 tons.
The volume and tonnage calculator does this for any size.
Crusher run needed by depth
| Depth | Cubic yards | Tons (approx.) | Tons +10% |
|---|---|---|---|
| 3 in | 6.67 | 10.3 | 11.4 |
| 4 in | 8.89 | 13.8 | 15.2 |
| 6 in | 13.33 | 20.7 | 22.7 |
| 8 in | 17.78 | 27.6 | 30.3 |
About crusher run
The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. Weight per yard is a planning number; the scale ticket at the yard is the real one.
Preparing the driveway
Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. Since the driveway carries car and truck traffic, a little extra depth is cheap insurance.
Ordering tips
- Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
- Delivery size. 15.2 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
- Bulk vs bags. At this size bulk delivery is usually the practical choice.
- Where it drops. Have the truck dump as close to the driveway as firm ground allows.
When to choose crusher run
Good uses:
- Base under asphalt, pavers or concrete
- Gravel drives that need a firm, packed surface
- Shed pads and equipment pads
Think twice for:
- Drainage layers, since the fines slow water
- Decorative beds
- Spots where you want water to soak straight through
Quick reference numbers
- Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.8 tons.
- Another size for comparison: a 20x25 area at 2 inches takes about 4.8 tons.
- Weight used here: about 1.55 tons per cubic yard.
Where estimates go wrong
- Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
Questions people ask
How many tons of crusher run for a 24x30 driveway?
About 13.8 tons at 4 inches deep, or 15.2 tons with 10 percent extra.
How many cubic yards is a 24x30 driveway at 4 inches?
About 8.89 cubic yards.
How much does a cubic yard of crusher run weigh?
Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.
How deep should crusher run be for a driveway?
The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.
How many square feet is 24x30?
720 square feet.
Related guides
- Crushed Stone vs Gravel: Differences and Best Uses
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does a Ton of Gravel Cover? Depth Chart
- How Much Crusher Run for a 22x300 Driveway?
- How Much Crusher Run for a 24x25 Driveway?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.