How Much Crusher Run for a 24x40 Driveway?

How much crusher run for a 24x40 driveway is a quick volume problem. 960 square feet at 4 inches comes to 11.85 cubic yards. Crusher run usually weighs about 1.5 to 1.7 compacted tons per cubic yard, so plan on roughly 18.4 tons.

Volume and tonnage calculator →

The math for a 24x40 driveway

  1. Area: 24 × 40 = 960 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 960 × 0.333 = 320.0 cu ft.
  4. Cubic yards: ÷ 27 = 11.85 yd³.
  5. Tons: × 1.55 = 18.4 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in8.8913.815.2
4 in11.8518.420.2
6 in17.7827.630.3
8 in23.7036.740.4

About crusher run

The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. If the yard sells by the cubic yard instead of the ton, use the cubic-yard column directly.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. For car and truck traffic, the depths in the table above are a reasonable starting range.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 20.2 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

When to choose crusher run

Best suited to:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Less suited to:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 15x30 area at 2 inches takes about 4.3 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Mistakes that throw off the order

  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
  • Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
  • Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.

Questions people ask

How many tons of crusher run for a 24x40 driveway?

About 18.4 tons at 4 inches deep, or 20.2 tons with 10 percent extra.

How many cubic yards is a 24x40 driveway at 4 inches?

About 11.85 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 24x40?

960 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.