AsphaltTons.com — asphalt tonnage calculator

How Much Crusher Run for a 24x75 Driveway?

A 24 by 75 foot driveway is 1,800 square feet. How much crusher run for a 24x75 driveway depends on depth: at 4 inches it is about 22.22 cubic yards or 34.4 tons. Suppliers usually sell by the ton, so the tonnage is the number to give them.

Volume and tonnage calculator →

The math for a 24x75 driveway

  1. Area: 24 × 75 = 1,800 sq ft.
  2. Depth in feet: 4 ÷ 12 = 0.333 ft.
  3. Cubic feet: 1,800 × 0.333 = 600.0 cu ft.
  4. Cubic yards: ÷ 27 = 22.22 yd³.
  5. Tons: × 1.55 = 34.4 tons.

The volume and tonnage calculator does this for any size.

Crusher run needed by depth

DepthCubic yardsTons (approx.)Tons +10%
3 in16.6725.828.4
4 in22.2234.437.9
6 in33.3351.756.8
8 in44.4468.975.8

About crusher run

The fines in crusher run fill the gaps between stones, so it weighs more per yard than clean stone once compacted. Plan on rolling or plate-compacting it in lifts. Ask your supplier for their own tons-per-yard figure, since stone source and moisture shift it.

Preparing the driveway

Strip sod and soft topsoil, grade for drainage and compact the subgrade before any stone goes down. Gravel drives last longer with a compacted base layer under the top stone and a slight crown so water runs off. Since the driveway carries car and truck traffic, a little extra depth is cheap insurance.

Ordering tips

  • Round up. Compaction and uneven ground eat material. Adding about 10 percent is common.
  • Delivery size. 37.9 tons may take more than one typical dump truck load; small loads may carry a delivery fee. See how many tons of gravel in a dump truck.
  • Bulk vs bags. At this size bulk delivery is usually the practical choice.
  • Where it drops. Have the truck dump as close to the driveway as firm ground allows.

When to choose crusher run

Works well for:

  • Base under asphalt, pavers or concrete
  • Gravel drives that need a firm, packed surface
  • Shed pads and equipment pads

Think twice for:

  • Drainage layers, since the fines slow water
  • Decorative beds
  • Spots where you want water to soak straight through

Quick reference numbers

  • Per inch over 100 sq ft: about 0.48 tons of crusher run (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.8 tons.
  • Another size for comparison: a 8x16 area at 4 inches takes about 2.4 tons.
  • Weight used here: about 1.55 tons per cubic yard.

Where estimates go wrong

  • Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.

Questions people ask

How many tons of crusher run for a 24x75 driveway?

About 34.4 tons at 4 inches deep, or 37.9 tons with 10 percent extra.

How many cubic yards is a 24x75 driveway at 4 inches?

About 22.22 cubic yards.

How much does a cubic yard of crusher run weigh?

Usually around 1.5 to 1.7 compacted tons, depending on stone size, fines and moisture.

How deep should crusher run be for a driveway?

The table above shows 3 to 8 inches. Shallower depths suit top dressing; deeper depths suit new installs and heavier use.

How many square feet is 24x75?

1,800 square feet.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.