How Much Does 50 Tons of Limestone Screenings Cover?
How much does 50 tons of limestone screenings cover depends on how deep you spread it. At about 1.4 tons per cubic yard, 50 tons is roughly 35.7 cubic yards. Spread 2 inches deep, that covers about 5,786 square feet. Go thinner and it covers more; go deeper and it covers less.
Volume and tonnage calculator →How the coverage is figured
- Tons to cubic yards: 50 ÷ 1.4 = 35.7 yd³.
- Cubic yards to cubic feet: × 27 = 964 cu ft.
- Divide by depth in feet: at 2 inches (0.167 ft), 964 ÷ 0.167 = 5,786 sq ft.
Coverage of 50 tons at different depths
| Depth | Square feet covered | Square yards |
|---|---|---|
| 1 in | 11,571 | 1,286 |
| 2 in | 5,786 | 643 |
| 3 in | 3,857 | 429 |
About limestone screenings
Screenings hold moisture and can crust over. Use them in thin layers over a compacted stone base instead of as a thick layer on their own. Weight runs about 1.3 to 1.5 tons per cubic yard, so treat the table as a planning range rather than an exact figure.
Planning around 50 tons
50 tons will usually take two or more truck loads, though legal limits vary by truck and state. Spread from the pile with a loader, skid steer or wheelbarrow, then rake to depth before compacting if the material calls for it.
- Check depth as you go. Stakes marked at the target depth help keep the spread even.
- Expect some loss. Compaction and uneven ground use more than the flat-math figure. Keep about 10 percent in reserve.
- Ask about moisture. Wet material weighs more, so a ton of it covers less.
To run your own numbers, use the volume and tonnage calculator.
Where limestone screenings fits
Best suited to:
- Paver and flagstone setting beds
- Firm walking paths
- Top-dressing a compacted stone base
Think twice for:
- Deep layers on their own
- Low spots that collect water
- Under heavy vehicle traffic without a base
Quick reference numbers
- Per inch over 100 sq ft: about 0.43 tons of limestone screenings (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.3 tons.
- Another size for comparison: a 20x25 area at 3 inches takes about 6.5 tons.
- Weight used here: about 1.4 tons per cubic yard.
Where estimates go wrong
- Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
- Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.
- Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
Questions people ask
How many cubic yards is 50 tons of limestone screenings?
About 35.7 cubic yards at 1.4 tons per yard.
How many square feet does 50 tons of limestone screenings cover at 2 inches?
About 5,786 square feet.
How many square feet does 50 tons cover at 1 inches?
About 11,571 square feet.
How much does a yard of limestone screenings weigh?
About 1.3 to 1.5 tons.
Will 50 tons fit in one truck?
It depends on the truck. Single-axle dump trucks often carry under 10 tons and tandems around 13 to 16; your supplier will know their limits.
Related guides
- #10 Stone (Stone Dust): Size, Uses and How Many Tons
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does 40 Tons of Limestone Screenings Cover?
- How Much Does 45 Tons of Limestone Screenings Cover?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.
