AsphaltTons.com — asphalt tonnage calculator

Tons of Crushed Stone per Mile of 28 ft Road

Tons of crushed stone per mile of 28 foot road: about 2,555 tons at 4 inches deep. The strip is 28 ft × 5,280 ft = 147,840 square feet. On a job this long, half an inch of extra depth adds a lot of tons.

Volume and tonnage calculator →

Tons by depth

DepthTonsTruckloads (~14 t)
3 in1,916137
4 in2,555183
6 in3,833274
8 in5,111366

The math

  1. Area: 28 × 5,280 = 147,840 sq ft.
  2. Volume at 4 in: 147,840 × 0.333 = 49,280 cu ft (1,825 cubic yards).
  3. × 1.4 tons per yard = 2,555 tons.

Road section basics

A 28-foot width gives two full lanes. Crushed stone has fractured faces, so the pieces interlock when compacted. That is why it holds a driveway or pad shape better than round stone of the same size. Crown the surface so water sheds to ditches on both sides.

Practical notes

  • Phasing. Large tonnages are delivered over days; schedule spreading and compaction to keep up with trucks.
  • Waste. Allow 5 to 10 percent.
  • Hauling. Distance from the quarry or plant often costs as much as the material on long jobs; see asphalt hauling cost per ton.

Check other sizes with the volume and tonnage calculator.

Where crushed stone fits

Best suited to:

  • Driveway top courses and parking pads
  • Shed and hot tub bases
  • Backfill behind walls when a clean size is used

Think twice for:

  • Barefoot areas, since angular stone is rough
  • Play areas
  • Places that need a smooth rolling surface for wheels

Quick reference numbers

  • Per inch over 100 sq ft: about 0.43 tons of crushed stone (0.31 cubic yards).
  • Per inch over 1,000 sq ft: about 4.3 tons.
  • Another size for comparison: a 12x24 area at 4 inches takes about 5.0 tons.
  • Weight used here: about 1.4 tons per cubic yard.

Where estimates go wrong

  • Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
  • Using inches as if they were feet. Depth has to be divided by 12 before you multiply; skipping that step inflates the order twelvefold.
  • Ordering exactly the math. Uneven ground and spillage nearly always need a little more than the flat calculation.
  • Skipping drainage. Water sitting under any surface softens the base and leads to ruts and potholes.

Questions people ask

How many tons of crushed stone per mile of 28 ft road?

About 2,555 tons at 4 inches.

How many truckloads is that?

About 183 loads at roughly 14 tons each.

How many square feet is mile of 28 ft road?

147,840 square feet.

Should I add extra for waste?

Yes, 5 to 10 percent is common.

Does this include the shoulders?

No. Measure shoulders and pullouts separately and add them.

Related guides

Open the volume and tonnage calculator → Asphalt tonnage calculator →

As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.