An Asphalt Golf Cart Path at Home
A private cart path is a narrow pavement for a light vehicle, not a driveway for delivery trucks. Width, turning, drainage, and a modest thickness still have to be planned in tons.
Open free asphalt tonnage calculator →Width and where it runs
A golf cart is narrow, but the path has to include a little shy distance for mirrors, a passenger's elbow, and the fact that tires do not track the painted center. Bridges, gates, and tight corners need more width than a straight run through open lawn. Slopes should be gentle enough that the cart does not slide when the surface is wet or lightly frosted, and the path should not dump a rider toward a wall. Decide whether maintenance trucks will use the same path. If they will, you are designing a driveway, not a cart path, and the section gets thicker. Keep the route off septic fields and away from shallow irrigation. A measuring wheel is useful to walk the centerline. It is not a survey of easements. If the path crosses someone else's land, the paving math does not replace permission.
A planning tonnage for a narrow path
Use length times width times thickness in inches divided by 12, times about 145 pounds per cubic foot, divided by 2000. Confirm density, often between 140 and 150, with the plant. Example: 6 feet wide, 200 feet long, and 2.5 inches thick is 6 times 200 times (2.5 divided by 12) times 145, divided by 2000, which lands near 18 tons. That example is only planning. Your soil may need more base, and your plant may not sell 2.5 inches as a single lift. Check the split. Enter your rectangle at AsphaltTons.com. The price per ton is the quote that day, and a short or awkward load may be priced as a minimum. Stone under the path is separate: cubic yards are length times width times depth in feet divided by 27, converted at about 1.4 tons per cubic yard for compacted crushed stone, confirmed with the quarry. Do not pave the 18-ton example on bare loam and expect the edges to hold.
Edges, cart tires, and tie-ins
Cart tires turn tightly and can scuff a fresh, hot surface or a soft edge. Keep carts off the new mat until it has cooled and firmed. Compact the edges extra carefully because a 6-foot path is mostly edge. Where the path meets a driveway, use a vertical, tacked joint rather than a feather that cart tires will peel. Shape a cross slope so rain does not sit in the wheel lines. Sealcoat is optional later maintenance on sound asphalt, not a way to glue loose stones on a thin path. If the path ruts under a pickup, the section was asked to do a truck's job. Do not fill those ruts with cold patch and call the route repaired. Cold patch is a temporary hole fill. Rebuild the failed piece with base and hot mix, and keep the heavy vehicle on a road that was built for it.
A practical sequence
- Decide whether only carts use the path or trucks will too.
- Measure width and length, then calculate asphalt tons and confirm with the plant.
- Place a compacted stone base and a cross slope that drains.
- Tie into other pavement with a vertical joint and keep carts off until the mat firms.
The mistake to skip
Designing a thin cart path and then running loaded pickups over it.
Questions people ask
Is 18 tons the right order for any cart path?
No. That is the 6 by 200 foot, 2.5-inch example only. Change any dimension and the planning tons change.
Do cart paths need sealcoat?
Only as later maintenance if the asphalt is sound and a sealer is appropriate. Sealcoat is not the structural surface.
Related guides
- Put a Sleeve Under the Driveway Before You Pave
- Setting a Post Through an Asphalt Driveway
- Setting a Mailbox Post in or Beside Asphalt
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.