How Much Does 29 Tons of Limestone Screenings Cover?
How much does 29 tons of limestone screenings cover depends on how deep you spread it. At about 1.4 tons per cubic yard, 29 tons is roughly 20.7 cubic yards. Spread 2 inches deep, that covers about 3,356 square feet. Halve the depth and you roughly double the area.
Volume and tonnage calculator →How the coverage is figured
- Tons to cubic yards: 29 ÷ 1.4 = 20.7 yd³.
- Cubic yards to cubic feet: × 27 = 559 cu ft.
- Divide by depth in feet: at 2 inches (0.167 ft), 559 ÷ 0.167 = 3,356 sq ft.
Coverage of 29 tons at different depths
| Depth | Square feet covered | Square yards |
|---|---|---|
| 1 in | 6,711 | 746 |
| 2 in | 3,356 | 373 |
| 3 in | 2,237 | 249 |
About limestone screenings
Screenings hold moisture and can crust over. Use them in thin layers over a compacted stone base instead of as a thick layer on their own. Weight runs about 1.3 to 1.5 tons per cubic yard, so treat the table as a planning range rather than an exact figure.
Planning around 29 tons
For delivery, 29 tons means multiple trips or a larger truck. Ask the supplier how they will split it. Spread from the pile with a loader, skid steer or wheelbarrow, then rake to depth before compacting if the material calls for it.
- Check depth as you go. Stakes marked at the target depth help keep the spread even.
- Expect some loss. Compaction and uneven ground use more than the flat-math figure. Keep about 10 percent in reserve.
- Ask about moisture. Wet material weighs more, so a ton of it covers less.
To run your own numbers, use the volume and tonnage calculator.
Good and poor uses for limestone screenings
Works well for:
- Paver and flagstone setting beds
- Firm walking paths
- Top-dressing a compacted stone base
Less suited to:
- Deep layers on their own
- Low spots that collect water
- Under heavy vehicle traffic without a base
Quick reference numbers
- Per inch over 100 sq ft: about 0.43 tons of limestone screenings (0.31 cubic yards).
- Per inch over 1,000 sq ft: about 4.3 tons.
- Another size for comparison: a 12x24 area at 2 inches takes about 2.5 tons.
- Weight used here: about 1.4 tons per cubic yard.
Where estimates go wrong
- Ignoring the base. A thin surface layer over soft soil fails early no matter how much material is on top.
- Mixing up cubic yards and tons. Yards are volume, tons are weight; convert with the product’s weight per yard.
- Assuming every supplier uses the same weight. Two yards selling the same product name can quote different tons per yard.
- Forgetting that compaction shrinks loose material. A loose 4-inch spread of a dense-graded stone may finish closer to 3 inches after rolling.
Questions people ask
How many cubic yards is 29 tons of limestone screenings?
About 20.7 cubic yards at 1.4 tons per yard.
How many square feet does 29 tons of limestone screenings cover at 2 inches?
About 3,356 square feet.
How many square feet does 29 tons cover at 1 inches?
About 6,711 square feet.
How much does a yard of limestone screenings weigh?
About 1.3 to 1.5 tons.
Will 29 tons fit in one truck?
It depends on the truck. Single-axle dump trucks often carry under 10 tons and tandems around 13 to 16; your supplier will know their limits.
Related guides
- #10 Stone (Stone Dust): Size, Uses and How Many Tons
- Tons to Cubic Yards for Gravel: Conversion Chart
- How Many Tons of Gravel in a Dump Truck? Loads and Coverage
- How Much Does 27 Tons of Limestone Screenings Cover?
- How Much Does 28 Tons of Limestone Screenings Cover?
As an Amazon Associate, AsphaltTons.com earns from qualifying purchases. Product links below are sponsored.